Solid Waste Management


Waste (Wet garbage , green waste residue and sludge etc. ) can be treated using TEAM processto generate Bio-gas and convert residue into valuable compost without needs of pre-processing ( grinding, slurry etc, ) The technology is simple and can be implemented on a decentralized basis at an individual project lelvel or ULB level.

The TEAM process is a two stage process of acidification and methanations.

ACIDIFICATION

6 reactors for extraction of organices
Volatile fatty acids
HRT of 6 days
Digested waste is a very good manure

METHANATION

High rate methanaton reactor
HRT- 16h and COD reducton-90%
Treatment of high strangth leachate to produce bio gas (75%)
Granules of 5mm and SVI of 5 ml/g

Advantages of TEAM Process

Aesthetic design in all biogas plants
Low maintenance cost
High energy & enriched manure
Elimination of SCUM formation & odour free
Produces no slurry & needs very low water requirement
Suitable for small/ decentralized & mid size applications

Small Size Projects

50, 100, 250, 1000, 2000
MOC for Tanks PP-FRP,MS-FRP

Large Size Projects

5, 10-25, tons/day for large townships
MOC for Tanks / RCC

Get in Touch

Please fill in the contact form below
and we will get back to you as soon as possible

Contact Info

A3 Techno Crafts Pvt. Ltd.
Multi Level Car Parking, 2nd Floor, Konnectus Tower,
(Above New Delhi Airport Express Line) Bhavbhuti Marg,
Connaught Place New Delhi-110001 India

Representative offices:
Dubai:,
Bhawan Tower, Al Nahda 1, Duabi, UAE

Nigeria:
69, Admiralty Way, Phase 1, Opp Electro Mart, Lagos, Nigeria

Canada:
7199 Wrigley Court, Mississauga. L5W0C8, Canada

United Kingdom:
35 Sherwood Gardens, Isle of Dogs, E14 9GA, London, United Kingdom

Australia:
96 Meurants Lane, Glenwoods NSW 2768, Australia

USA:
6352 Inglewood Drive, Pleasanton CA 94588, San Francisco, USA

Germany:
Reichenschwand, Germany